Building
# 2130: The Seedling Processing Plant
Buildings
Summary
(Trout Creek Field)
Facilities Layout
Diagram
 |
Physical
Description: This 35,000 square foot building, constructed in 1976 is
separated into three main sections. A central processing building (with support
facilities, meeting rooms, staff rooms, toilet rooms and laboratory) is flanked
by two wings of cold storage containing four and two cooler rooms respectively. The main processing room contains some processing equipment
and has a concrete floor that is sloped to drain. All coolers are accessible via
outside loading areas. Major systems in the facility include single phase
electrical, three-phase electrical, irrigation control room, three heat pumps,
steam heat to processing work space, power doors at coolers, refrigeration
systems at 6 coolers, digital temperature and humidity control system, and a
Halon fire protection system.
|
|
Year
of Construction:
|
1976
|
|
Square
Footage:
|
35,000
SF
|
|
Construction
Type:
|
Wood
frame, board and batten siding at 24” on center.
Steel
columns throughout.
2x8
wall studs at walls, glue lam beams.
Metal
roof, standing seam.
Aluminum
windows
|
|
Systems:
|
Single
phase electrical
Three-phase
electrical
Irrigation
control room
Heat
pumps (3)
Steam
heat to processing work space
Power
doors at coolers
Refrigeration
systems at 6 coolers: Glycol circulating pumps, currently being run to
avoid gelling of glycol.
Digital
temperature and humidity control system.
Halon
fire protection system
|
 |
 |

|